VES Andover Ltd · Eagle Close · Chandlers Ford Industrial Estate · Chandlers Ford · Eastleigh · Hampshire · SO53 4NF
Tel: 08448 15 60 60 | Fax: 023 8026 1204 | Email: vesltd@ves.co.uk
:: Home
:: About Us
:: Products
:: Site Services
:: Northern Office
:: Spares
:: Staff
:: Buy Online
:: Vacancies
:: VES Charity
:: Download O & M's
:: Contact Details
Contact us for further information:
Name
Company
Address
Postcode
Phone Number
E-mail Address
Enquiry

SITE SERVICES

Refurbishment of air handling units by VES Specialist Site Services is one of a wide range of disciples available.

CLICK HERE for PDF BROCHURE

Refurbish
and upgrade any make of Air Handler or ventilation equipment.

Retrofit
cooling coils, humidifiers, silencers, upgraded filter sections etc.

Renew
fans, motors, dampers, coils etc.

Re-work
ventilation systems that don't work.

Reports
prepared from site surveys of old or faulty equipment and systems.

Flat Pack
installation of VES air handling units.

Energy Saving Surveys
Comprehensive surveys including operation of controls, air volume measurements, functioning of equipment, condition report, installation of inverter drives, recommendations with energy saving proposals.

HVAC Noise Problems
Site survey with noise measurements, report, installation of silencers and acoustic treatment.

Specialist Maintenance
For all types of ventilation equipment.

Duct Cleaning
Free initial survey provided.

Controls/Electrical
Installation and post-install check on VES supplied controls and wiring.

Contact : Peter Adams - Flat Pack/Refurb Manager 02380 461167

As buildings age, much of the original ventilation equipment ceases to function. Coils become blocked, filter frames deteriorate, the bottom of units rust out due to water damage. Routine maintenance procedures do not cover these sort of problems. Old equipment often has a high maintenance requirement.

Failure to meet current performance requirements is also another reason to refurbish failing systems.

VES engineers can upgrade your equipment and give it a new lease of life. This starts with a site survey, report and quotation, tailored to your technical and budgetary requirements.

Once a programme of work has been agreed, method statements and risk assessments will be issued, a detailed site survey will include airflow, pressure and noise measurements as necessary.

The Refurbishment Division is part of the VES Andover organisation, and can draw on considerable resources for both manufacturing and personnel requirements. All project management and site work is carried out by VES employees.

VES also undertake small jobs, for example replacing an unsuitable noisy extract fan with a silenced unit, or straight forward replacement of defunct equipment.

Kitchen Ventilation

Slug and Lettuce, Southampton - ventilation Kitchen

VES Site Services are experts in solving kitchen ventilation problems.
This includes:

  • Retro-fitting Grease Grabber high efficiency filters to reduce duct cleaning costs and fire risk.
  • Installing specialist high temperature fans.
  • Solving noise problems caused by kitchen extract fans. Installing the unique VES cleanable silencers.
  • Kitchen canopies modified, expanded or replaced. 
  • Control panels for kitchen ventilation in accordance with BS 6173/2001.
  • Solving kitchen extract and make-up supply air problems.
  • Providing energy saving solutions for kitchen ventilation using the Ecovent-K air handling unit.
  • Curing ventilation odour problems with electro-static, ultra-violet and carbon filters.

Case Histories

New Look, Aberdeen
Complete refurbishment of two large roof top air handling units, including replacement of fan bearings, new motors, new electric heater batteries, replacement of corroded casework including new roofs, new DX coils and condensing units with associated refrigerant pipework and controls.

Before
Before
After
After

Office complex, Leicester
Seven large air handling units in poor condition could not be replaced due to site location and lack of cranage access.

Before
Before
After
After

VES refurbished the units to a high standard, including much work on the cases, new gas heaters,  new DX coils and built-in condensers/compressors, new supply and extract fans, new controls. The buildings were noise sensitive, so all work was done at night and weekends to avoid disruption.

Marks & Spencer, Cardiff
When M & S took over the adjacent store, they wanted the ventilation plant refurbished to a high standard. This included double skinning of the AHU cases, damaged access panels replaced, new dampers, new filter sections, plus the twin fans and roof extract units overhauled.

Debenhams, Oxford Street, London
30 year old air handling units given a new lease of life with new fans, coils, filter sections plus casework modifications.

Elizabeth House, by Waterloo Station, London
A major office complex with large air handling plant. Work included removal of an antiquated spray coil system and installation of an evaporative humidifier, new dampers, new filter sections, new steel plantroom doors, new twin fan and extract units.


The VES Flat Pack AHU Installation Service

Flat Pack installation of air handling units and other VES products can result in big savings, including builders work costs, crane hire, road closure and out of normal hours working.

VES will build your air handling unit in difficult locations and take full responsibility in ensuring the plant will fit the space available and is correctly assembled.

A site survey is usually necessary for a trouble free installation.

VES engineers will man handle the components to the position required. All you need to do is provide a level surface for the unit and have cleared the area of old plant and debris. For larger units specialist lifting equipment may be provided.

Only skilled VES employees undertake this work, ensuring high standards and completion in the minimum amount of time.

Case History

The Methodist Central Hall, London
Built in 1898, was converted in 2002 for the "Bloody Sunday" government inquiry. VES air handling units were installed by the Flat Pack team in a room converted to a plantroom. There was poor access to the room via a stairwell.

The equipment was designed and built in the normal way, and assembled in the VES factory without any fastners being fitted. After inspection it was taken apart into component pieces and rebuilt on site as a finished product.

LATEST NEWS

Ecovent NRG
Ecovent NRG

High efficiency heat recovery air handling units with low energy fans and fitted controls with touch screen remote.

Options include:
  • ECA approved high efficiency plate heat exchangers.
  • Shallow units for ceiling voids.
  • Case construction to BS EN 1886 standard.
  • Plug fans with fitted inverter.
  • Prewired controls, with air quality sensor if required.
  • Duty range from 0.125 m3/sec to 2.5 m3/sec.
  • Units available plantroom or weatherproof, flat or stacked configuration.
  • Twin fans on extract.
  • SFP published at all duty points

... click for more info

VES – Ventilation for the Nation
VES

 

ISO 9001-2000
Cert. No. Q5375
Home | About Us | Products | Site Services | Staff and Sales Contacts | Download O & M's | Contact Details
Related Links | Purchasing Terms & Conditions
© VES Andover Ltd. All rights reserved  |  Web development Seemore Graphics